La Maison Tricotée
The crush
The crush
Size
0-1 months, 3-6 months, 6-12 months
Material
- 50 grams of sock yarn by Mimi Fée (80% merino, 20% nylon, 400 m/100g)
- 1 set of 2.5 mm double-pointed needles
- 1 yarn needle
- 2.5mm needles
Abbreviations
- medical
- knit stitch
- 2 Sets
- 2 stitches knitted together
- m
- mesh
Sample
30 m for 10cm with 2.5 mm needles in stocking st. Important : check the sample and adjust the needle number if necessary.
Realization
The hat is knitted in one piece and started with the cattooth border:
Cast on 92 (100, 108) stitches. Knit 4 rows in stocking st, then, a row of hole-holes from the right side as follows: 1 st, * 2 tog, 1 yarn over * repeat until the last stitch and finish with 1 st.
Knit 5 more rows in stockinette st (starting with a purl row).
Then, fold up the hem by pulling up a stitch on the cast-on row and knitting it with the corresponding stitch on the needle.
Continue by knitting in stocking st for a total height of 8.5 (10, 11.5) cm.
Increase 6 stitches for the neck at the beginning of the next 2 rows = 104 (112, 120) stitches.
Continue in stockinette st over these sts until 9.5 (11.5, 13.5) cm and at the end of a knit row, transfer these sts to a set of double pointed needles. Join in the round and continue in stockinette stitch decreasing for the back of the bonnet as follows:
Realization
Size 0-1 months
row 1: * 11 sts, 2 tog * repeat until finished measurements.
Knit one row.
row 3: * med 10, tog 2 * repeat until finished measurements.
Knit one row.
row 5: * st 9, tog 2 * repeat until finished measurements.
Knit one row.
Row 7: * 8 mD, 2 Tog * repeat until finished measurements.
Knit one row.
row 9: * med 7, tog 2 * repeat until finished measurements.
row 10: * med 6, tog 2 * repeat until finished measurements.
Knit one row.
row 12:* med 5, tog 2 * repeat until finished measurements.
Knit one row.
row 14: * med 4, tog 2 * repeat until finished measurements.
row 15: * sd 3, tog 2 * repeat until finished measurements.
row 16: * med 2, tog 2 * repeat until finished measurements.
row 17: * sd 1, tog 2 * repeat until finished measurements.
Thread the yarn through the remaining stitches.
Tuck in all the wires.
Size 3-6 months
row 1: * 12 sts, 2 tog * repeat until finished measurements.
Knit one row.
row 3: * 11 sts, 2 tog * repeat until finished measurements.
Knit one row.
row 5: * med 10, tog 2 * repeat until finished measurements.
Knit one row.
row 7: * 9 sts, 2 tog * repeat until finished measurements.
Knit one row.
row 9: * st 8, tog 2 * repeat until finished measurements.
Knit one row.
row 11: * med 7, tog 2 * repeat until finished measurements.
row 12: * med 6, tog 2 * repeat until finished measurements.
Knit one row.
row 14:* med 5, tog 2 * repeat until finished measurements.
row 15: * med 4, tog 2 * repeat until finished measurements.
row 16: * MS 3, TOG 2 * repeat until finished measurements.
row 17: * med 2, tog 2 * repeat until finished measurements.
row 18: * sd 1, tog 2 * repeat until finished measurements.
Thread the yarn through the remaining stitches.
Tuck in all the wires.
Size 6-12 months
row 1: * med 13, tog 2 * repeat until finished measurements.
Knit one row.
row 3: * med 12, tog 2 * repeat until finished measurements.
Knit one row.
row 5: * 11 sts, 2 tog * repeat until finished measurements.
Knit one row.
row 7: * med 10, tog 2 * repeat until finished measurements.
Knit one row.
row 9: * st 9, tog 2 * repeat until finished measurements.
Knit one row.
row 11: * st 8, tog 2 * repeat until finished measurements.
Knit one row.
row 13: * med 7, tog 2 * repeat until finished measurements.
row 14: * med 6, tog 2 * repeat until finished measurements.
row 15:* med 5, tog 2 * repeat until finished measurements.
row 16: * med 4, tog 2 * repeat until finished measurements.
row 17: * MS 3, TOG 2 * repeat until finished measurements.
row 18: * med 2, tog 2 * repeat until finished measurements.
row 19: * sd 1, tog 2 * repeat until finished measurements.
Thread the yarn through the remaining stitches.
Tuck in all the wires.
Finishes
Cast on 4 stitches with 2.5 mm needles and make a 65 (70, 72) cm knit or “I-cord”. Sew it along the neckline of the bonnet, leaving an equal length overhang on each side for the 2 ties. (I use a mechanical knitting machine to make my I-Cord, very practical and fast!)
Tuck in all the wires.
Well done !